12-16-2015, 02:23 PM | #1 |
Second Lieutenant
![]() ![]() 138
Rep 254
Posts |
Upgrade Electric In Home
Having a home generator installed and in the midst of installation (which has taken forever) the contractor is telling me my house is at 120 amps I should have a mininium of 150 probably 200 on a house this size. Of course telling me that my current electric panel won't pass the code and this work needs to be done. So between over 10k for the generator, 3k for the gas company now I'm looking at God knows how much for new electric panel in my house.
|
12-16-2015, 03:44 PM | #2 |
Brigadier General
![]() 5644
Rep 3,270
Posts |
Can't imagine it being too much compared to the other costs you're facing. Just so long you're not dealing with aluminum wire or knob and tube. Now that would get crazy fast.
|
Appreciate
0
|
12-16-2015, 03:44 PM | #3 | |
Lieutenant
![]() ![]() ![]() ![]() 614
Rep 534
Posts |
Quote:
That's not all. You will have to pull a permit which will most likely cause your taxes to go up. Mine went up by like 200 bucks a year..... permit was 120 dollars and varies by city, town and state.
__________________
![]() |
|
Appreciate
0
|
12-16-2015, 03:48 PM | #4 |
Lieutenant
![]() ![]() ![]() ![]() 614
Rep 534
Posts |
oh and don't bother shopping around every place I called it was within dollars of the other guys. Its like an electrician's mafia or something. They all say the same price and wont budge.
__________________
![]() |
Appreciate
0
|
12-16-2015, 03:48 PM | #5 |
Lieutenant General
![]() ![]() ![]() 7717
Rep 12,046
Posts
Drives: MY24 G01 AW Msport
Join Date: Feb 2008
Location: L.I. NY
|
contractor see $$ when owner is upgrading or doing some kind of renovation. I would get second opinion. I believe you would have to submit electric load calc, and explanation for more power before you can get approval for electrical upgrade. New electric feed must be fed into your house, its my understanding from meeting I attend. I work for MEP firm but I do the plumbing design.
verify with your electric company before doing anything |
Appreciate
1
|
12-16-2015, 05:02 PM | #6 |
Second Lieutenant
![]() ![]() 138
Rep 254
Posts |
This house is old 60+ years. Not to mention that work was being done 30 years ago it was done very half ass.
I am set with a 150 amp right now but the wavutal amp is 100 that runs from the street to the house. I also know that when several ACs are on or too many lights a fuse blows. Of course I know contractors see $$$ and I was already told that being the outsides wires aren't enclosed I wouldn't pass inspection. I have a permit already for the generator and being the contractor doing generator is the one who is getting electrican I don't know if I'll need another permit. He was also talking about switching out my breaker and bla bla bla. I want everything to pass inspection but I just feel like one simple thing being done is now turning into a major pain in the ass for me. If it's a matter of $1500 to $2000 I won't mind all the work but looking online I've seen things going from $4000-$9000 which is just not worth it to me at all. Not to mention I still need gas meter installed and everything running and hooked up. |
Appreciate
0
|
12-17-2015, 07:43 AM | #7 |
Lieutenant General
![]() ![]() ![]() 7717
Rep 12,046
Posts
Drives: MY24 G01 AW Msport
Join Date: Feb 2008
Location: L.I. NY
|
Everything has to be done by NY or NYC code to pass inspection. Just have contractor do the work and make some kind of deal to do rest of the work.
|
Appreciate
0
|
12-17-2015, 07:58 AM | #8 | |
Lieutenant
![]() ![]() ![]() ![]() 614
Rep 534
Posts |
Quote:
Each breaker is about 50 -70 bucks. The box itself is 400 max. Talk to them with relevant pricing know what they are tyring to sell you. It will make it harder for them to justify the price they are pushing on you.
__________________
![]() |
|
Appreciate
0
|
12-17-2015, 08:25 AM | #9 |
TrizzlemyniZzzlE3
75
Rep 591
Posts |
Im a union electrican if you need a hand swapping out that panel i can help one day after work or maybe a saturday at a fraction of the cost a contactor is gona charge you . Let me know Ryan 516-642-2866
Last edited by Ryguy29; 12-17-2015 at 08:55 AM.. |
Appreciate
0
|
12-17-2015, 11:48 AM | #10 |
Second Lieutenant
![]() ![]() 138
Rep 254
Posts |
Contractor doing it now. Moving meter, moving wires, increasing amps. $2600 which from what I've seen online is a little below average.
The work needed to get done cause the set up wasn't even up to code and no way it would have passed inspection when they come to check work. All this headache for a backup generator, would have been much simpler and faster if we already had a gas line. |
Appreciate
0
|
12-17-2015, 12:03 PM | #11 |
Captain
![]() ![]() ![]() ![]() 346
Rep 946
Posts |
OP, he might be right or wrong. You didn't give is enough info to decide or help you. What is your question anyways. You just stated your situation.
Phage in mind that electric codes have changed in the past years. The older the home, the weaker the codes were. Now a days you need 12ga wire for the kitchen, bathroom, laundry and a lot of dedicated outlets. Your hose is wired and most probably you are using one circuit for lights and outlets on a bathroom. That for exams,e won't pass code right now. There are several of this codes that are new to your house. Bear in mind that all electric appliances and lights use less power but you are plugging more things. It's impossible to give you an answer at his input since we do not have an electric schedule and electric plan to study. Is there an specific reason why he wants to upgrade the electric panel. Now a days a 2,000 sq ft can use a 200 amp panel. A 100 amp panel might be good for townhouses. Good luck Last edited by M3Bimmer77; 12-17-2015 at 12:33 PM.. |
Appreciate
0
|
12-17-2015, 12:08 PM | #12 |
First Lieutenant
![]() ![]() ![]() 172
Rep 310
Posts
Drives: 2018 EB F31 2018 LG F80
Join Date: Nov 2009
Location: Ontario
iTrader: (0)
Garage List 2020 BMW M2 CS [9.83]
2021 Porsche 718 Sp ... [8.50] 2021 BMW R1250GSA [0.00] 2014 Boxster S [0.00] 2013 BMW R1200GS [0.00] 2011 1 Series M Coupe [10.00] |
I can't comment on what your requirements are in the jurisdiction in which you live regarding the necessity to use a licensed electrician to install panels. If you have a main shutoff / disconnect, that would be a good idea. With a main shutoff you should be able to compete the work yourself (you could do it without, just not adviseable)
The generators I am familiar with (Genrac) use a sub panel that have a switch that is triggered when a power interruption is detected. From my understanding the power protected circuits are terminated to the sub panel. This is usually a 60 amp panel that is attached to a 60 amp breaker in your main panel. Panels and breakers are not super expensive, comparative to the labor. In my experience, unless you have a clean panel with breakers which is a current brand, like Siemens, Square D or Eaton, etc, it is best to add a new panel. If I were in your position, I would update the main panel at the same time as you install the sub panel required for the generator. I would also upgrade to at least 2 phase 200 amp power, or greater. You want to be able to charge your i8! B. |
Appreciate
0
|
12-17-2015, 02:14 PM | #13 | |
Lieutenant
![]() ![]() ![]() ![]() 614
Rep 534
Posts |
Quote:
__________________
![]() |
|
Appreciate
0
|
12-17-2015, 02:18 PM | #14 | |
Lieutenant
![]() ![]() ![]() ![]() 614
Rep 534
Posts |
Quote:
__________________
![]() |
|
Appreciate
0
|
12-17-2015, 03:19 PM | #15 | |
Lieutenant General
![]() ![]() ![]() 7717
Rep 12,046
Posts
Drives: MY24 G01 AW Msport
Join Date: Feb 2008
Location: L.I. NY
|
Quote:
|
|
Appreciate
0
|
12-17-2015, 08:49 PM | #16 | |
Second Lieutenant
![]() ![]() 138
Rep 254
Posts |
Quote:
I had my contractor do everything. Where I live on LI in a village it is a nightmare. Anytime anything gets done I need a permit, I have heard of people having issues where they bought a house, had work done that they had a permit for, when inspectors came they saw a deck and fined the person over $400 cause they didn't have the deck in their paper work even though the person said he bought the house with the deck. All electric is in, gas line is run, generator (generac) is in my backyard. Of course it's not hooked up and done yet because like stated above, the town needs to come in and check every piece of dirt on my property before the gas company can turn on the gas meter. I'm waiting for them to reject everything because the sidewalk is dug up and I can't fix it until all work is finished and dirt is put back. At least the electric is out of the way and done legally and right. That's a huge load off my mind. |
|
Appreciate
0
|
12-17-2015, 10:18 PM | #17 |
Lieutenant General
![]() ![]() ![]() ![]() 2165
Rep 10,176
Posts |
Btw, there is no such thing as a 120A service. My guess is that you were a 100A service coming in and you upgradeed to a 200A. 2/0 Copper wire for the service entry is expensive, and eats most of your cost.
If you had a panel where circuits were doubled up, they'll be separated. Othersie, if you were not popping breakers, or of there was no shoddy work done, there might not have been a need to do a service change. |
Appreciate
0
|
12-17-2015, 11:02 PM | #18 |
***** noob
![]() 1460
Rep 10,477
Posts
Drives: 325xi>M235i>428GCx Mspor
Join Date: Sep 2005
Location: Boston
|
If its not broken, dont fix it
__________________
2006 325xi (Sold)
2014 M235I (Current) 2015 428xi Gran Coupe (STB) |
Appreciate
0
|
12-17-2015, 11:56 PM | #19 | |
First Lieutenant
![]() ![]() ![]() 172
Rep 310
Posts
Drives: 2018 EB F31 2018 LG F80
Join Date: Nov 2009
Location: Ontario
iTrader: (0)
Garage List 2020 BMW M2 CS [9.83]
2021 Porsche 718 Sp ... [8.50] 2021 BMW R1250GSA [0.00] 2014 Boxster S [0.00] 2013 BMW R1200GS [0.00] 2011 1 Series M Coupe [10.00] |
Quote:
Here in Canada, I call the ESA (Electrical Safety Authority) order a permit over the phone. Call them when I am ready for rough in inspection, then a final when everything is done and they close the permit and give me a certificate. No electrician required. Hope you get it sorted out... B. |
|
Appreciate
0
|
12-18-2015, 06:21 AM | #20 | |
Brigadier General
![]() 5644
Rep 3,270
Posts |
Quote:
And others have already commented about the permit requirements. |
|
Appreciate
0
|
12-18-2015, 09:16 AM | #21 | |
Second Lieutenant
![]() ![]() 138
Rep 254
Posts |
Quote:
New circuit box is bigger so if need be I can add more. Generator is connected and I'm just waiting now for final inspection and gas company to install meter to turn on my gas and wait for the next storm. |
|
Appreciate
1
|
12-18-2015, 09:19 AM | #22 | ||
dances with roads
5244
Rep 4,145
Posts |
Quote:
Quote:
|
||
Appreciate
0
|
![]() |